The EVO3 on site Bonneville

This morning August 7, conclusive tests have been conducted on the site of Bonneville during the bitumen flow.

To optimize this action, and more performance in achieving the latter, the communication system VOKKERO® EVO3 has allowed us to optimally link the truck driver and the foreman.

Vokkero équipe le chantier de Bonneville

Share this article:

Other related articles

  • 20/20 for Vokkero Squadra

    This is the score given by Nicolas Maestre, Referee Trainer with the French Basketball Federation after testing Vokkeroยฎ Squadra under actual conditions of use. He gives us his first impressions.

    20/20 for Vokkero Squadra