The EVO3 on site Bonneville

This morning August 7, conclusive tests have been conducted on the site of Bonneville during the bitumen flow.

To optimize this action, and more performance in achieving the latter, the communication system VOKKERO® EVO3 has allowed us to optimally link the truck driver and the foreman.

Vokkero équipe le chantier de Bonneville

Share this article:

Other related articles

  • VOGO and Myrtha Pools sign a partnership to deploy a connected pool solution

    VOGO and Myrtha Pools, the worldโ€™s leading swimming pool builder, today announce the signing of a partnership for the deployment of a connected pool offer. The aim of this collaboration is to equip Myrtha pools with a turnkey video recording and broadcasting solution. This solution is directly embedded in the white stainless steel pools built…

    VOGO and Myrtha Pools sign a partnership to  deploy a connected pool solution