The EVO3 on site Bonneville

This morning August 7, conclusive tests have been conducted on the site of Bonneville during the bitumen flow.

To optimize this action, and more performance in achieving the latter, the communication system VOKKERO® EVO3 has allowed us to optimally link the truck driver and the foreman.

Vokkero équipe le chantier de Bonneville

Share this article:

Other related articles

  • Optimization of communication at COLAS SUISSE

    TRENCHLESS EXCAVATION WORK Maintenance of electrical networks or underground pipe systems, replacement or repair of existing underground infrastructuresโ€ฆ most construction work in urban environments haveย some degree of risk of injury. Today, companies such as Colas Switzerland specialize in trenchless excavation which enables workย to be carried out without having to open up the street.ย However, some constraints…

    Optimization of communication at COLAS SUISSE